Building a Legacy! Talk to Us!
Project Description:
The unsolicited project proposal is approximately 50.43 km tollway, including spur roads (Tagaytay Spur and Tuy Spur), consists of a two-by-two lane carriageway traversing mostly the rural areas of Silang, Tagaytay, Amadeo, Mendez, Alfonso, and Magallanes, all in the Cavite province, and Nasugbu in Batangas. The alignment has the following interchanges as follows: Silang, Pook, Aguinaldo, Amadeo, Mendez, Alfonso, Magallanes and Nasugbu.
Project Objectives:
This project aims to:
Provide free-flowing, high facility alternative route for traffic, presently plying Aguinaldo Highway and Sta. Rosa-Tagaytay Road, which are experiencing congestion during peak periods and weekends.
Provide linkage between Metro Manila, Cavite, and Batangas.
Provide highway of international standards with a limited number of interchanges, thus improving access to nearby areas such as Amadeo and Indang.
Project Concessionaire:
Metro Pacific Tollways South Corporation (MPTSC) and Metro Pacific Tollways Corporation (MPTC)
Project Cost:
Php 25.24 B
Project Status:
Original Proponent to comply with the requirement under RA 11966: An act providing for the Public-Private Partnership Code of the Philippines (“PPP Code”) relative to requirements and project processing.
Project Alignment: